VERTEX redefined the entire process of mine development projects in the Philippines. It only took 6 months from the preliminary investigation, exploration, environmental assessment, production line design, feasibility demonstration and investment return analysis phase to equipment production, construction, installation, finetune and commission phase. At the same time, an optimal balance was achieved between highest production efficiency, most environmentally friendly, fastest production, and highest return on investment. It is a typical case with the highest overall planning efficiency, the most scientific equipment production plan and on-site installation, and the most efficient production and operation.
VERTEX can provide clients with customised end-to-end services during the planning stage of a new project. According to the actual situation of the local area, we can uncover the real customer/client needs, and use the most economical, efficient and practical methods to design the most scientific, reasonable and economical overall project plan, thereby proposing the most effective solution.
During the preliminary investigation of the Philippines project, it was found that due to the special climate and geological conditions of the Philippines, the top-soil layer of the mine is more than 20 meters deep. If conventional development methods are used, on one hand, it would be difficult to handle the soil layer, on the other hand, production efficiency will be greatly reduced. With this specific site characteristic in mind, VERTEX proposed a targeted set of solutions that considers future environmental restoration responsibilities and also reduces costs by 10% and improves efficiency by 30% compared to traditional development methods.
Reduced costs by 10%
Increased efficiency by 30%
VERTEX not only can provide clients with reliable production equipment, but can also formulate a suitable construction plan according to many factors such as local labour, construction scale and climatic conditions. This plan includes construction goals, as well as construction plans and manuals formulated according to the specific needs of the clients, supported by on-site guidance and supervision services . As an equipment supplier, VERTEX will take care of the entire process from equipment production, cargo transportation to installation and commissioning, ensuring an improvement in overall efficiency and a reduction in overhead costs for the clients.
As an experienced mining technology consulting company, a leading global equipment manufacturer and the most experienced mine operator and creative mine development planner, VERTEX can guarantee the continuity and stability of the development and subsequent processing to the greatest extent. The production lines currently operated by the VERTEX team span the globe, and continue to create value for clients without exception.
View the table of content page for the Final exploration Report for the Philippines Quarry, learn how we achieve the optimal balance between cost-effectiveness and sustainability.
The event, held at conference center of UBS by SCCC at beginning May 2024, brought together the EMBA members from Antai College (ACEM) to explore th
In November 2023, VERTEX was invited as guest speaker to attend the panel discussion regarding tech collaboration, which was organized by Greater Zu